A 3kW rooftop solar system in Chennai costs ₹2.2 to ₹2.5 lakh including GST from Sri Saran Solar, or about ₹1.2 to ₹1.5 lakh after the ₹78,000 PM Surya Ghar subsidy and the ₹22,000 Tamil Nadu state subsidy. A 5kW system starts from about ₹3.2 lakh. The final price depends on panel and inverter brand.
How much does solar cost in Chennai?
| System size | Price (incl. GST) | After central subsidy (₹78,000) | After central + state subsidy (₹1,00,000) |
|---|---|---|---|
| 3kW | ₹2.2-2.5 lakh | ₹1.42-1.72 lakh | ₹1.2-1.5 lakh |
| 5kW | from about ₹3.2 lakh | from about ₹2.4 lakh | from about ₹2.2 lakh |
Panels are from Panasonic, Vikram, Tata or Eastman; inverters are from Polycab, PowerOne or Eastman. Your exact price depends on the brands you choose, your roof and a site survey.
What does the price include?
- Solar panels and an on-grid inverter of your chosen brand.
- Elevated galvanised mounting structure.
- DC and AC distribution boxes, cables, earthing and a lightning arrestor.
- Transport and end-to-end installation.
- Help with your PM Surya Ghar, state subsidy and net-metering applications.
How much subsidy can you get?
| System size | Central (PM Surya Ghar) | Tamil Nadu state top-up | Total |
|---|---|---|---|
| 1kW | ₹30,000 | ₹5,000 | ₹35,000 |
| 2kW | ₹60,000 | ₹10,000 | ₹70,000 |
| 3kW and above | ₹78,000 | ₹22,000 | ₹1,00,000 |
The central subsidy is ₹30,000 per kW for the first 2kW and ₹18,000 for the third kW, so it stops growing at 3kW. Tamil Nadu launched its state scheme on 21 September 2026; TEDA pays the state share by direct bank transfer. Modules must be made in India with domestic cells (domestic content requirement); we confirm that the panels you choose qualify. You pay the system price first; the subsidy is credited to your bank account afterwards.
On-grid or hybrid: which should you choose?
On-grid systems cost less, need little maintenance and cut your bill, but switch off during a power cut for safety. Hybrid systems add a battery so essentials keep running when the grid fails; they are quoted after a site survey and are best for homes with frequent outages.
What affects the final price?
- System size, which sets the number of panels and the inverter rating.
- Roof type and the height of the mounting structure.
- Single-phase or three-phase connection.
- Panel and inverter brand.
Warranty and payment terms
- Panels, inverter and workmanship each come with a written warranty; terms depend on the brand you choose.
- Payment: 50% advance on order, 40% on supply to site, 10% on installation and commissioning.
- Written quotations stay valid for 15 days.
Get your exact price
Call or WhatsApp +91 90873 70405 and share your last electricity bill. We recommend a system size and book a free site survey anywhere in Chennai.
Last updated: 2 November 2026. Subsidy rules can change; confirm current amounts on the PM Surya Ghar national portal.